HSE Documents-Risk Assessment Uninterruptible Power Supply PPM |
To download the complete file for HSE Documents-Risk Assessment Uninterruptible Power Supply PPM, click on the link at the end of these points:
Hazards
- Unauthorized entry to UPS room (Unlock and or
broken lock)
- Limited information, guidelines, or safety
warning signs and posters
- No existence of an Emergency Response Plan (ERP)
- Tripping on uneven flooring
Risk
- Electric shock
- Electrocution, property/asset damage,
- Fire
- Injury or fatality
- Delayed/latency in response during an emergency.
- Multiple physical injury
Risk Agent
- Work Environment
- Civil/structural
Personal Protective Equipment (PPE)
- Multimeter
- Infrared Thermometer
- Battery Tester
- Battery Hydrometer
- Insulation Tester (Megohmmeter)
- Oscilloscope, Load Bank
- Torque Wrench
- Screwdrivers and Nut Drivers
- Cleaning Supplies
- Safety Equipment
- Documentation Tools
- Software Tools
- Remotely
- Replacement Parts
- UPS Manuals and Documentation
- Labeling Materials
- Flashlight or Portable Lighting
- UPS Maintenance Checklist
Control Measures
- Proper & strict access control policy and system
- Inspection and maintenance of door locks
- Only authorized personnel should be allowed to enter the UPS rooms
- Use and installation of electrical hazard signs and other safety-related warning signs technical guidelines and informational posters
- Formulation of a proper ERP
- Proper implementation of the ERP plan
- Conduct drill as per the ERP.
- Installation of proper caution/warning signs/posters.
- Proper installation of flooring.
No comments:
Post a Comment