RISK ASSESSMENT FOR INSTALLATION TESTING FOR FIREFIGHTING PIPING SYSTEM AND ACCESSORIES |
The following are sub-activities in the risk assessment installation testing for firefighting piping systems and accessories uploaded by the HSE Documents. To download the complete risk assessment, click on the link given below.
Sub-Activities
1. Prepare the work area
2. Storage Material
3. Manual Handling
4. Working at Height
5. Working in the excavated area and floor opening area
6. Working with hand-held tools/ Power tools
7. Gas Cutting
8. Noise atmosphere
9. Operating with Thread Machine
10. While working at night shift
11. Working in hot weather
12. Work Completion