Method Statement Uploaded by HSE Documents for Heating, Ventilation, and Air Conditioning (HVAC) Air Distribution System Installation The Purpose of this procedure is to define the sequence and methodology for all critical installation activity about HVAC air distribution system with the scope of work, applicable standards, and drawings. The following are the key points you will get in the method statement’s attached file.
TABLE OF CONTENT
1.0 PURPOSE
2.0 DEFINITIONS AND ABBREVIATIONS
3.0 SCOPE OF WORK
4.0 TOOLS AND EQUIPMENT
5.0 MATERIAL HANDLING
6.0 SITE PLANNING AND PREPARATION
6.1 ACCESS ROUTES & STORAGE SPACE
6.2 WORKING AT HEIGHT
6.3 RESPONSIBILITIES
6.4 PROJECT MANAGER
6.5 PROJECT ENGINEER
6.6 SUPERVISOR / FOREMAN
6.7 QUALITY CONTROL/QUALITY ASSURANCE ENGINEER
6.8 HSE ADVISOR / SAFETY OFFICER
7.0 MATERIAL RECEIVING INSPECTIONS
7.1 PROCURED ITEMS INSPECTION
7.2 RECORDS
8.0 EXECUTION METHODOLOGY
8.1 DUCTING
8.2 AIR CONDITION EQUIPMENT INSTALLATION (FCU, AHU & FAHU)
8.3 FRESH AIR AND EXHAUST FANS
9.0 ENVIRONMENTAL, SAFETY AND HEALTH
9.1 RISK ASSESSMENT
9.2 LIST OF TYPICAL TASK INVOLVES RISK
9.3 SPECIFIC EMERGENCY PROCEDURES
9.4 TOOLBOX TALK
9.5 PERSONAL COMMITMENT
9.6 PERSONAL PROTECTIVE EQUIPMENT
No comments:
Post a Comment