Activity-1
Mobilization of PPR Pipes to the Site
Hazards
Traffic Vehicles & Plant
Controls Measures
- Toolbox talk conducted before starting the job
- Used appropriate PPE including safety shoes.
- Always carry materials near the body
- Keep arms width apart: Bend the knees & keep the back straight at all times when carrying the materials
- Avoid twisting & jerking the body while carrying the materials
- Careful handling of fragile items
- The maximum weight to be carried should not exceed more than 25kg in normal conditions.
Activity-2
Unloading of materials from vehicle by manually
Hazard
Falling of materials from Truck while unloading
Controls Measures
- Toolbox talk conducted prior to start the job
- Used appropriate PPE include safety shoes.
- Always carry materials near the body
- Keep arms width apart: Bend the knees & keep the back straight at all times when carrying the materials
- Avoid twisting & jerking the body while carrying the materials
- Careful handling of fragile items
- Maximum weight to be carried should not exceed more than 25kg in normal conditions."
Activity-3
Pre-Job set up
Hazard
Improper hand / small power tools used
Controls Measures
- Toolbox talk conducted prior to start the job
- Select proper tools suitable for specified job.
- Check operating conditions of hand/power tools prior to start the job & should be color coded by competent person
- Damaged tools shall be removed from the use and tagged to "" do not use""
- Inspect the power cords for damaged, damaged cords removed from the job
- Disconnect the power tools when not in use
- Appropriate PPE should be used"
Activity-4
Installation of PPR pipes and fittings
Hazard
Height Work-peoples Materials Falling from Ladder or Scaffold That May Cause Injury or Fatal
Controls Measures
- Toolbox talk conducted prior to start the job
- A work permit must be received prior to start the height work.
- Ensure that scaffold or ladder are good condition before climb.
- Proper access should be provided & damaged or home mad ladder.
- Adequate guard rails should be provided.
- The working platform should be clean
- Safety harness shall hook to the trusses in such a manner as tube able to arrest his fatal and tie off 100% at height during all works.
- Competent supervisor should be on working area at all times."