TOTAL FREE HEALTH AND SAFETY DOCUMENTS DOWNLOADING SOURCE

 


Breaking

Saturday, September 2, 2023

HSE DOCUMENTS-METHOD STATEMENT FOR CONSTRUCTION OF CIVIL WORKS

 

METHOD STATEMENT FOR CONSTRUCTION OF CIVIL WORKS

1. INTRODUCTION

This Method Statement uploaded by HSE Documents outlines the procedures and guidelines for the construction of civil works, including excavation, filling, and allied activities, in compliance with the contract documents, specifications, and the defined scope of work. The cause of this file is to ensure the secure, efficient, and systematic execution of the project.


2. PURPOSE

To specify the requirements of civil construction including excavation, filling, and allied activities complying with the contract document, specification, and scope of work and approved drawings/documents. It also includes earthworks associated with trenches for pipelines or service ducts.


3. SCOPE

This Method Statement applies to all civil works Excavation including:

  • Ground preparation
  • Setting out
  • Backfilling
  • Soil compaction
  • Concreting
  • Waterproofing
  • Masonry
  • Plastering
  • Joinery
  • Painting
  • GRC works - related to the construction of the building as per project requirements, referring to approved Civil and MEP drawings.


4. Health and Safety


4.1. Safety Procedures

  • All personnel involved in the project must comply with local safety regulations and wear appropriate personal protective equipment (PPE).
  • A site-specific safety plan has been developed and will be implemented throughout the project.
  • Regular safety briefings and toolbox talks will be conducted to address potential hazards and promote a safety-first culture.


4.2. Emergency Procedures

  • Emergency evacuation plans and first-aid facilities are in place.
  • Firefighting equipment is readily accessible and regularly maintained.
  • Contact information for emergency services is posted prominently on-site.


5. Equipment and Resources


5.1. Machinery and Equipment

  • A list of machinery and equipment required for the project is attached in Appendix A.
  • All equipment will be properly maintained and inspected regularly for safety and functionality.


5.2. Materials

  • All materials used in the construction will meet the project specifications and quality standards.
  • The source and quality of materials will be verified before use.

TO DOWNLOAD THE COMPLETE EDITABLE AND WORD FORMAT, CLICK ON THE LINK GIVE BELOW:

Download File Now

No comments: