HSE DOCUMENTS-METHOD STATEMENT FOR CABLE GROUNDING INSTALLATION

 


HSE DOCUMENTS-METHOD STATEMENT FOR CABLE GROUNDING INSTALLATION

TITLE OF THE METHODOLOGY DOCUMENT


Underground Earthing Works


SCOPE

This Technical methodology document for “Cable Grounding Installation, Underground earthing installation work” is to describe and highlight the minimum requirements for earthing conductor installation in materials receiving, storing, and installation procedure.


OBJECTIVE

This is to assure that the requirements of underground earthing installation works meet the code requirements and contract specifications. To make sure, the works are carried out in acceptable workmanship and follow the requirements of the project.


REFERENCE                                                                                   

Applicable Manufacturers Recommendation

Contract Specifications and Approved Construction Drawing

Standards, codes, and recommended practices


RESPONSIBILITY

5.1 The Site Engineer at the site shall be responsible for the planning scheduling and coordination, recording and monitor the progress of Underground earthing works. To guide the supervisors in the field in terms of engineering and technical problems.


GENERAL WORK

The field installation, inspection, and test of underground Earthing shall be executed under the responsibility of the contractor according to the relevant drawings and documents.

The work shall be done according to good workmanship and by using the suitable tools and materials as stated in the construction drawings, approve documents, and procedures and it shall be studied before carrying out any electrical works.


Safety and Sanitation: 

Full care and precaution shall be given by the field management for the safety and sanitation of workmen in the field to prevent accidents during the execution of the works.


GENERAL STEP OF CABLE GROUNDING INSTALLATION

Prepare the clamping tool:

To know the C clamp is already installed correctly, we must measure the difference end of the C clamp before and after the clamping proses.

Ensure excavation work in every building foundation already finish, and the elevation of excavation appropriate with the design level

Install Grounding cable in every building foundation, Installation starts from base excavation, and cable grounding must be in touch with the soil.

Ensure every connection of the grounding cable is installed correctly.

For grounding cable rise up the installation must be installed accurately and securely.

 