RISK ASSESSMENT FOR WORKING AT HEIGHTS-SCAFFOLDING

 

RISK ASSESSMENT FOR WORKING AT HEIGHTS-SCAFFOLDING

For the risk assessment of Working at height-scaffolding, uploaded by QHSE Documents. The level of risk associated with Working at height scaffolding can be assessed based on the impact and severity of the probable risk in aseptic practice in manufacturing units, particularly in the construction, facility management, and other sectors. On completion of the risk assessment, control and measures must be developed and recommended actions for unacceptable risk will be identified for improved Current construction and working at the height of local and international Regulations compliance and qualification of the system upgrades. After completion of the risk assessment, the recommended actions must be extended and verified against the qualification stages for Working at height-scaffolding. This risk assessment will enable you to know the basic answers to various questions and requirements such as what is the best control method for working at heights? What are the risks of working at heights? Risk assessment for working at height. What are the terms used in scaffolding? How do you erect scaffolding step by step? What are the three main scaffolding types? Working at height risk assessment doc? safe work method statement example, working at height risk assessment pdf, working at heights jsa, working at heights method statement uk, roofing risk assessment and method statement, working at heights procedure,  Scaffolding method statement example, safe work method statement scaffolding, safety procedure in erecting scaffolding, scaffolding inspection procedure pdf, scaffolding procedure, free scaffolding method statement template, scaffold risk assessment, and method statement, dismantling scaffolding procedures. To download more health and safety documents, keep visiting HSE Documents regularly. Don’t forget to subscribe to the site. It will send a notification for each document upload.


Significant Hazards


1. Falls from heights


1.1. Who Might Be Harmed?

  • Operative
  • Contractor
  • 3rd Parties

1.2. How Is the Risk Controlled?

  • Working at height risk assessments are reviewed regularly and revised as appropriate.
  • Relevant employees have been trained in the hazards associated with working at height and the control measures to be employed.
  • All work at height is properly planned (access equipment, emergency procedures, consideration of obstructions, weather conditions).
  • Safe access/egress to/from, work at height areas is provided and ladders are secured to scaffolding.
  • All work at height is supervised by a minimum level 2 scaffolder.
  • All operatives working at height will be working from edge-protected platforms with handrails for using harnesses connected to access points. Hard hats and protective clothing/footwear are always worn.
  • Working at height procedures are checked and monitored regularly.
  • Safety harnesses and anchoring points are checked regularly by a competent person. Scaffold structures are erected and dismantled by competent contractors and checked by a competent person (scaffolding supervisor).
  • All work-at-height operations are checked and monitored regularly by a competent person. Double lanyards are to be used when working on beams.


2. Falling objects


2.1. Who Might Be Harmed?

  • Operative
  • Contractor
  • 3rd Parties

2.2. How Is the Risk Controlled?

  • Materials are not stored at height unless required.
  • All reasonably practicable measures are taken to avoid falling objects (fences, barriers, and toe boards).
  • Areas, where objects may fall directly below and surrounding the scaffolding, are cordoned off whilst scaffolding is being erected/dismantled. All Operatives and site visitors must always wear safety helmets during the erection and dismantling of the scaffolding.
  • Scaffolding is to be constructed as per design.
  • All work will be stopped if these conditions are not met.
  • Scaffolding will be inspected by the scaffolding supervisor and signed off before handover.


3. Manual Handling


3.1. Who Might Be Harmed?

  • Operative
  • Contractor
  • 3rd Parties

3.2. How Is the Risk Controlled?

  • Manual handling risks assessed.
  • Staff trained in manual handling and re-visited during toolbox talks.
  • Mechanical aids are used where possible. Scaffolding must be inspected regularly or after an incident by a competent person.


4. Slip/Trip risk


4.1. Who Might Be Harmed?

 Operatives

4.2. How Is the Risk Controlled?

  • Good site housekeeping must be maintained and inspected by the scaffolding supervisor.
  • Only required Operatives on-site during the erection and dismantling of the scaffolding. No public access until the site has been signed off by the scaffolding supervisor.
  • Correct footwear must be always worn.

DOWNLOAD THE FILE
RISK ASSESSMENT FOR WORKING AT HEIGHTS-SCAFFOLDING

No comments: