This safe work document uploaded by HSE documents for the "Method Statement for Excavation & Backfilling for Open Foundations & Footings" is in editable and ready-to-use format and will enable to prepare of a detailed and authentic methodology document such as method statement for excavation works pdf, method statement for excavation and backfilling pdf, safe work procedure for excavation pdf, foundation excavation method statement, excavation method statement example, manual excavation method statement, safe work method statement for excavation, trench excavation method statement. To download more health and safety documents such as risk assessments, risk assessments, safety forms, and checklists, keep visiting the site regularly.
1. Purpose
The following is a detailed method statement of the procedures to be followed for excavation & backfilling of foundations work, Substructures & Trenches for any kind of construction and road project department.
2. Scope of Work
The method highlights the following:
- Survey works,
- Excavation,
- Backfilling,
- Compaction,
- Area cleaning after the completion of works.
3. Termite Proofing Treatment
You will also find a separate work methodology for termite proofing and control that is related to the excavation works.
4. Below is a sequence of work
4.1. Excavation.
4.2. Compaction/Consolidation of formation of excavation. Anti-Termite Treatment.
4.3. Blinding Concrete/ RCC Footings/ Tie beams.
4.4. Backfilling
YOU WILL ENABLE TO KNOW ABOUT THE FOLLOWING:
5. Health & Safety Requirements
6. Roles & Responsibilities
7. Excavation Works Method
7.1. Clashes with Existing Services
7.2. Structures Adjacent to the Project Plot
7.3. Survey
7.4. Preparation of Sub-grade for Foundations
7.5. Dewatering
7.6. Anti-Termite Treatment
7.7. Backfill and Compaction
8. Field Tests
8.1. For trenches
8.2. For walkways
8.3. For aggregate road base
8.4. Backfilling within the building
No comments:
Post a Comment