RISK ASSESSMENT FOR THE INSTALLATION AND TESTING OF 11KV CABLES AND RELATED WORK


RISK ASSESSMENT FOR THE INSTALLATION AND TESTING OF 11KV CABLES AND RELATED WORK

This Risk Assessment covers installations and testing of 11KV cables. The technical safety document "Installations and Testing of 11KV Cables" is uploaded for the premium users by HSEDOCUMENTS and the objective of this Hazard Identification and Risk Assessment document is to provide full support to the technical and installation team for the 11 kV cables safety and their related works.


Activity

  1. Working at height
  2. Lifting
  3. Material Storage
  4. Power Tools


Hazards

  1. Physical and Health Injury
  2. Fall, stuck by, hit by materials, back injury
  3. Tripping 
  4. Strike by-Bursting of Disc


Response, Precautions, and Control Measures

Wear a safety helmet, safety shoes, safety gloves, safety glasses, and HV Jackets. Check materials tools before commencing work. Conduct housekeeping before and after work Disposed of waste separately regularly.

The material should be stored and segregated properly, having ensured access/egress routes. All ladders should be inspected regularly with appropriate color coding. routine checks must be done by the user before teaching use. All ladders should be secured or someone must hold them while in use. Use inspected and tagged scaffolding platform if necessary, and wear full body harness 100 percent tied off in the open elevated area.

Using any crane needs an appropriate lifting permit, certified operator, and rigger. daily inspection checklist, the position of lifting gear, and crane certificates. Determine the load to be lifted. Manual handling should be done with the body system if the load to be lifted is long or heavy. check the pathway during hauling.  Barricade the area with proper signage

All materials should be segregated properly providing proper access/egress route. All power tools should be inspected and color-coded. All operators should attend training/seminars. Do not exert too much pressure on the abrasive wheel, provision shielding to prevent striking the flying object.


Comments and Details

To be checked by FM/Supervisor Before commencing the work. All personnel involved in this activity must attend the Safety Task Analysis Risk Reduction Talk (STARRT). Talks ensuring they signed in the attendance sheet. The FM/Supervisor should explain in detail the hazard and its corrective measures to prevent an accident. FM/Supervisor to check before commencing work

The engineer must ensure that the ladder is inspected and color-coded before use

All scaffolds should be erected under the supervision of a competent scaffolding supervisor and checked by a competent inspector.

The engineer should ensure the permit and requirements before the start of work the engineer should determine the load and be coordinated with the rigger /operator. FM/Supervisor to monitor from time to time and should be discussed during Safety Task Analysis Risk Reduction Talk (STARRT). FM/Supervisor to check before commencing work. The engineer should ensure this procedure/requirements


DOWNLOAD THE FILE

Risk Assessment For The Installation And Testing Of 11KV Cables