The following health and safety documents are being uploaded...
Method Statements:
1. Method Statement for Earthing and Lightning Protection
2. Method Statement for Installation of Underground Electrical UPVC Pipes
3. Method Statement for Conduit Installation
4. Method Statement for Cable Trays, Trunking and Cable Ladders
5. Method Statement for Power Cable Installation
6. Method Statement for Building Wires Installation
7. Method Statement for Isolators - Disconnect Switches Installation
8. Method Statement for Wiring Devices Installation
9. Method Statement for Installation of Elevators
10. Method Statement for Installation of Lighting Fixtures (with handwritten comments)
11. Method Statement for Installation of Lighting Fixtures
12. Method Statement for Installation of Emergency Central Battery System
13. Method Statement for Transformer Installation
14. Method Statement for MV Panels Installation
15. Method Statement for Sub-Main Distribution Boards and Distribution Installation
16. Method Statement Diesel Generator Installation
17. Method Statement for HV Switchgear Installation
18. Method Statement for Installation of Lighting Management System
19. Method Statement for Dock Leveler Installation
20. Method Statement for Audio Visual Installation
21. Method Statement for Uninterruptible Power Supply Installation
22. Method Statement for the Installation of Fire and Voice Alarm
23. Method Statement for Gate Barrier Installation
24. Method Statement for Assistive Listening System Installation
25. Method Statement for 11KV Cable Installation
26. Method Statement for the Testing and Commissioning of Fire & Voice Alarm System
Risk Assessments:
1. Risk Assessment for Earthing and Lightning Protection
2. Risk Assessment for Installation of Underground Electrical UPVC Pipes
3. Risk Assessment for Conduit Installation
4. Risk Assessment for Cable Trays, Trunkings and Cable Ladders
5. Risk Assessment for Power Cable Installation
6. Risk Assessment for Building Wires Installation
7. Risk Assessment for Isolators - Disconnect Switches Installation
8. Risk Assessment for Wiring Devices Installation
9. Risk Assessment for Installation of Elevators
10. Risk Assessment for Installation of Lighting Fixtures (with handwritten comments)
11. Risk Assessment for Installation of Lighting Fixtures
12. Risk Assessment for Installation of Emergency Central Battery System
13. Risk Assessment for Transformer Installation
14. Risk Assessment for MV Panels Installation
15. Risk Assessment for Sub-Main Distribution Boards and Distribution Installation
16. Risk Assessment Diesel Generator Installation
17. Risk Assessment for HV Switchgear Installation
18. Risk Assessment for Installation of Lighting Management System
19. Risk Assessment for Dock Leveler Installation
20. Risk Assessment for Audio Visual Installation
21. Risk Assessment for Uninterruptible Power Supply Installation
22. Risk Assessment for the Installation of Fire and Voice Alarm
23. Risk Assessment for Gate Barrier Installation
24. Risk Assessment for Assistive Listening System Installation
25. Risk Assessment for 11KV Cable Installation
26. Risk Assessment for the Testing and Commissioning of Fire & Voice Alarm System
No comments:
Post a Comment