This Method Statement cover installations of PVC single core insulated wires defined by the Specifications.
1. SCOPE OF WORK
This procedure defines the method to be used to ensure that building wires installations are correct and acceptable and shall conform to the specifications.
2. REFERENCES
2.1. Project Specifications
2.2. Electrical Shop Drawings
2.3. Approved Material Submittals
2.4. Approved Safety Plan
3. RESPONSIBLE PERSONNEL ON SITE
3.1. Electrical Field Engineers
3.2. Safely Officer
3.3. OA/OC Engineer
3.4. Electrical Supervisors.
4. SAFETY
General HSE Statement:
4.1. All safety precautions shall be followed as per the approved safety plan & procedure
4.2. Ensure all involved persons are aware of the same
4.3. Safely officer to ensure that all working platforms and ladders shall be safe and in good condition.
4.4. Ensure that all tradesmen shall leave their working places clean, tidy end free of rubbish.
![]() |
BUILDING WIRE INSTALLATION |
No comments:
Post a Comment