The following are some of the main important text taken from the original file for the risk assessment and their control measures for the Split AC Units installation. To download a complete risk assessment for the "Split AC Units", click on the given link at the end of these points:
Task/Element
Transport of units
Potential Hazards
Traffic collision fall of material
Proposed Control measures
- Conduct PEP talk before loading/unloading.
- Mechanically fit, tested, and inspected vehicles shall be used.
- The condition of the vehicle shall be checked and approved before transport of units
- While shifting, the duct material shall be securely placed in the involved truck.
- The duct shall be tightly secured using Nylon ropes.
- A vehicle with a suitable platform & foldable side gates shall be involved to prevent the fall of items.
Task/Element
Installation of Units
Potential Hazards
- Fall of men from
- Ladder/scaffold.
- Fall of material from Height.
- Injury from using a hack saw cutter etc.
- Dust, debris, and Splinters
- Trip hazard
Proposed Control measures
- All Personnel equipment shall be worn by workmen.
- Well-trained, physically fit workforce/Rigger shall be involved in the unloading of ducting operation.
- Use of safety helmets, Shoes, Fluorescent jackets, and other relevant PPEs ensured for all workers.
- Tools and materials shall not be scattered around the workplace and shall be neatly stacked in a convenient location.