HSE Documents is a totally free and easy download source and project of a huge variety and quantity of occupational health safety and environmental documents such as HIRA, JSA, JHA, risk assessments, forms, checklists, safety training including toolbox talks, PowerPoints, and many more. Just keep on visiting and send us feedback in the comments section.
The following is a Hazard Identification and Risk Assessment (HIRA)-Job Safety Analysis (JSA) for Radiography Test of Boiler Joints. To download the editable file, just click on the link given at the bottom of this post.
Activity No 1. Shifting of Equipment and material to location (including source)
HAZARDS
Falling of material
Safety Precautions
- All material should be shifted through a trolley/Trailer and foremen must wear all PEEs
- All lifting tools must have a valid test certificate.
- Before starting work ensure that sling must be fixed properly with D-Shackle.
HAZARDS
Radiation leakages
Safety Precautions
- The person should be trained and competent to operate the exposure device.
- The source container should be leakproof. Same should be insured by survey meter.
- Source capacity is 20 Curie so at least 20 Mets area all around should be barricaded.
- Inspection agency to be registered with state's regulatory and compliance agencies/bodies.
Activity No 1. Taking of films
HAZARDS
Radiation leakages
Safety Precautions
- The source container should be leakproof. Same should be insured by survey meter.
- Source capacity is 20 Curie so at least 20 Meters of the area all around should be barricaded.
- All people should be evacuated from the all-around 20 Meters area around the source.
- By survey meter, continuous inspection is to be done all around the area. Radiation after the bracketing should be less than 2 MR.
- The Survey meter should valid calibration certificate.
- Ample supervisors/workers should be positioned to stop any unknown person from getting into the barricaded area.
Fall of person
- Use fall protection equipment must be used as per the standard
- Workmen must be trained and certified to work at heights.
- Fall protection equipment must be tested valid test certificate available.
Activity No 1. Safe storage of radiation material.
HAZARDS
Radiation leakages
Safety Precautions
The source container should be leakproof. Same should be insured by survey meter.