TOTAL FREE HEALTH AND SAFETY DOCUMENTS DOWNLOADING SOURCE

 


Breaking

Saturday, October 16, 2021

Risk Assessment for Split AC Units Installation

To download complete risk assessment for Split AC Units Installation-AC duct in Word editable format for free from hsedocuments, click on the link given at the end of this short article text. Activities including working with electricity, transport of units, installation of units, transport of ducting, installation of ducting, transport of piping material, piping support work, piping erection, transport of insulation, installation of insulation, transport of insulation, use of electrical equipment, use of extension leads, defective equipment, before starting a machine.

Hazard / Hazardous Situation

  • Exposure to dust/debris
  • Unintended falls of material/tools/debris
  • Muscular skeletal injuries cuts/abrasions
  • Poor handling technique sharp or jagged edges
  • Injury from using a hack saw, cutter, 
  • Physical injury from using drilling/hammer machine, pipe cutting tools etc.
  • A traffic collision, fall of material and
  • Fall of men from ladder/scaffold. 
  • Allergy due to the material in the case of rock wool. dust, debris and splinters.
  • Material damage
  • A tripping hazards (cuts/abrasions, muscular-skeletal and other physical injuries)
  • Electrical shock, burns and fire

Control Measures

  • Workers/technicians not needed to be in the proximity of the duct outlets and will be kept out of the area.
  • Proper and essential personal protective equipment such as dust masks, gloves and eye protection to be worn by those in the vicinity of duct outlets during commissioning
  • AC ducting system cleaned frequently during installation and immediately before commissioning
  • Appropriate safety warning signs to be placed around duct outlets during system commissioning
  • Always refer to Risk Assessment (RA) for specific lifting equipment used.
  • All Personnel equipment Shall be worn by workmen.
  • Appropriate rigger shall be engaged for unloading of Units.
  • Use of safety helmets, Shoes, Florescent
  • Jacket and other relevant PPEs ensured for all workers.
  • Proper housekeeping must be practices and tools and material shall not be scattered
  • A pre-use check conducted by users
  • All electrical equipment, tools and machinery must bring on to the site must have been third-party and PAT electrically tested.
  • Make sure that workers know how to use the electrical equipment safely.
  • Always make sure that there are no trailing cables that can cause people to trip or fall.
  • Don’t use the equipment if it appears faulty and must be checked by a competent person.
  • Consider using a residual current device



Download File
Risk Assessment for Split AC Units Installation 

1 comment:

Daniel Bryan said...

Thanks for every other informative site. The place else may just I get that kind of information written in such an ideal means? I have a venture that I’m just now operating on, and I have been on the look out for such information.
air conditioning heating services in daphne al