Method Statement for Screeding Work

1- PURPOSE

The purpose/aim/objective of this Method Statement (MST) for Mortar Screed Works is to highlight and explain in detail the procedure such as;

  1. Design mix, 
  2. Mixing, 
  3. Pouring 
  4. Curing. 

Moreover, to Inform all concerned project engineer and supervisors including workers the value and importance of this activity before implementation. This screeding activity should be executing with rigorous compliance and implementation of Safety requirements, procedure and project specifications to accomplish the work for concrete screed.

2- SCOPE OF WORKS

The scope of Screeding Work Method Statement is to covers the works in (Name of the Building/Project) 

3- PROCEDURE

General

  • All method statements related documents and mix proportion must be approved from concerned department/authority/personal and easily available upon request.
  • Free water shall be removed from the subfloor.
  • Screed shall be laid with a minimum of 50 mm thick.
  • Check that the Mechanical and Electrical services under screed have been completed and protected as per the drawing/specification.
  • The curing arrangement shall be done as per the requirements.
  • Ensure waterproofing as per the approved method and materials only.

To download the complete file for Screeding Work, click on the following link:👇




Download File
Method Statement for Screeding Work.