To prepare checklist for the Floor Screeding inspection, following are some main points:
1- Substrate Surface Preparation
- The substrate is clean from grease, oil and dirt
- The substrate is free from cracks and exposed bars
- Waterproofing is done and completely cured
2- Setting Out / Marking
- Level pegs provided/available as per the survey marking.
- Vertical & horizontal control/check was implemented to check all pegs.
- Appropriate and essential number of level pegs, interval provided at every meter
- Correct finishing elevation, offset and drop
- If screeding thickness >25 millimeters, double-check and verify the specification for the requirement of wire mesh/any other reinforcement
3- Coordination With Other Works
- Wall plastering within the area completed
- Concealed services/fittings are laid/installed
4- Mixing & Batching Mortar Screed
- Clean sand used for mortar screed mixing
- The material used as per specification
- The correct mixing ratio of cement to sand, 1:
5- Screeding & Finishing
- Accomplish level, alignment and evenness are acceptable.
- Check the falls
4 comments:
It is fine, nonetheless evaluate the information and facts around this correct. posadzki anhydrytowe
I wanted to thank you for this excellent read!! I definitely loved every little bit of it. I have you bookmarked your site to check out the new stuff you post. contractor near me
I wanted to thank you for this excellent read!! I definitely loved every little bit of it. I have you bookmarked your site to check out the new stuff you post. contractor near me
Outside polypropylene rugs can assist you with planning your open air region at an entirely reasonable expense.
learn more about Persian rugs
Post a Comment