To prepare checklist for the capacitor bank, use the following points:
- Capacitor Banks - Materials are approved
- Equipment undamaged
- Indicator lamps are correct & Working condition of all breakers & Switches
- Mounting of panel, correct size of plinth has been provided with leveled at correct location
- Ensure that panels are vertical and fixing bolts have been tightened with suitable nuts and washers
- Ensure that all doors of the panel open and closes properly
- Ensure that panel earthing is completed (Protective conductor connected to the panel and continuity is verified)
- Ensure that no dust within chambers/compartments
- Ensure all cable inlet sealed properly
- Earth Links and Accessories
- Panel Internal wiring and accessories
Download File
No comments:
Post a Comment