This Method of Statement is concerned to Planning, Preparation, Conduct and Method for the safe Excavation, Concrete Footings & Structural Work to the boundary walls of the property/building/facility.
will provide guidance to prevent injury to workforce involved in the excavation, concrete footings and structural works. It also provides a safe system of work (SSOW) to prevent any destruction to adjacent facilities/buildings.
Unfortunately, underground construction work will always – genetically and unavoidably – cause some movement in the nearby & surrounding ground. A project that is poorly designed and/or constructed would bear to cause greater ground movement and, hence, have greater potential for damaging adjacent structures and or facilities. This compared with a well-designed and well-executed scheme for which ground movements have been minimized and controlled.
No comments:
Post a Comment