Wile preparing and making inspection for ventilation PPM, the following key ponts must be take into Consideration:
A. VISUAL AND MECHANICAL INSPECTION
- EXTERIOR OF EQUIPMENT
- COMPLETENESS OF ASSEMBLY
- EQUIPMENT ROTATION
- ELECTRICAL/MECHANICAL INTERLOCKS
- INSTRUMENTS
- PROPER GROUNDING
- PROPER INSULATION
- TIGHTNESS OF BOLTED CONNECTIONS
- PROPER LUBRICATION
- CONDENSATE DRIP PANS
- EQUIPMENT IDENTIFICATION
- BRACING
- LABELING AND TAGGING
- SAFETY INTERLOCKS
- WORKING SPACE
- ANCHORAGE
- SYSTEM CLEANED
- COMPARISON TO DRAWINGS
- CONTROL SYSTEM
- FILTERS
B. CALIBRATION AND SET-POINT
- SENSORS
- CONTROLLERS
- ACTUATORS
- FIRE DAMPERS CHECKED
- SMOKE DAMPERS CHECKED
C. SYSTEM TESTS
- FAN
- DUCT LEAK TEST
- AIR BALANCE TEST
- COIL NUMBER
- COIL NUMBER
- CONTROL DAMPERS
- SYSTEM TEST
Download File👇
7 comments:
The very last result became a massive hit and all and sundry is inspired with the outstanding work
Customer's property, Insurance for HVAC Businesses would help to pay for any repairs. This insurance policy also assists with legal expenses that you may be responsible for if a third-party were to file a lawsuit against you.
Their willingness to communicate openly complimented their professional management style.Bay Area Home Remodeling
3d automated pin inspection I would like to say that this blog really convinced me to do it! Thanks, very good post.
Dear Valued reader, thanks for your positive and good feedback.
I want more and more articles and blogs please post soon such informative information.
Cryptocurrency Investor
Services quality as well as the relevance of the ads for the audience and arrange your own advert teams correctly. How Does Addiction Affect the Family Program Georgia?
Post a Comment